1.In general, it should also be installed in parallel two shale shaker (can also according to user requirements of parallel three), so that when a screen failure, it can be changed another, without influencing the drilling process. When use of double pump drilling, or fluid viscosity is high, the two shaker can be used at the same time.

shale shaker

shale shaker

2.The shale shaker should be placed on level on the conical mud tank. The operating channel should be left on both sides of shale shaker about 0.6~1m. And then loaded on three way dual gate shunt slot, then connect the elevated tank installation slot.

steel frame
3.Shaker screen, and wire service life and using effect is very important for a shaker, therefore, it should be strictly in accordance with the following steps to install screen: namely the screen flat with a tension hook plate on screen in screen on the bed edge, then use the hook plate bolts to connect the hook plate and the sieve box side plates, and were wearing sealing sleeve, inner gasket, spring and an outer gasket, the hook plate nut people hook plate bolt and tighten. Hook plate bolt tightening, should first make the middle of each piece of hook plate tensioning bolt to tension, and then the two bolts on both sides of the alternate tension, until the screen tensioned.

solid control

solid control

 
Notes: it should be maintained every screen two hook plate tight angle as far as possible consistent.