• Worm Gear/Helical Bevel Gear Mud Agitator

    We know the mud agitator is consisting of motor and reducer. According to the connection method between the motor and reducer, there are two types mud agitator, Helical Bevel Gear Mud Agitator and Horizontal Worm Gear Mud Agitator. On the selection of mud agitators, Based on the different gearbox, there are helical bevel...

    more

  • 10″ Desander Cones, 4″ Desilter Cones for Mud Cleaner

    In Drilling rig mud system, Drilling mud cleaner installed 2×10″ desander cones 12×4″ desilter cones. The model of mud cleaner called BWZJ2S12N, BWZJ2S12N mud cleaner is commonly used in solid control systems, such as in the ZJ30 750HP-ZJ90 3000HP drilling rig mud system, “2S” means 2×10″...

    more

  • (ZJ70) 2000HP Drilling Rig Mud System for Saudi Aramco

    Recently, the (ZJ70) 2000HP drilling rig mud system manufactured by Brightway company for Saudi Aramco is about to be delivered. Saudi Aramco (Saudi Arabian Oil Company), is an international oil company with top-ranking comprehensive strength. About 66% of the world’s proven crude oil reserves are concentrated in...

    more

  • The Second ZJ90(3000HP) Drilling Rig Mud System for Ultra Deep Well Project

    The second set of ZJ90 (3000HP) drilling rig mud system of Brightway has been officially put into operation at the Xinjiang Oilfield site. This set of drilling rig mud system is the second system in the three sets of 9000-meter ultra-deep well drilling rig mud system cooperation project signed between Brightway and Xinjiang...

    more

  • ZJ30 Solids Control System Delivered to Pakistani Customers

    On February 26th, Brightway ZJ30 oil drilling solids control system was being assembled and debugged, and will soon be delivered to a Pakistani customer. The ZJ30 drilling rig solids control system is equipped with mud shaker, vacuum degasser, desander desilter, decanter centrifuge, jet mud mixer, mud circulation tank,...

    more

  • Brightway Wishes A Happy New Year 2024

    On February 5th, Brightway 2012-2024 Annual Conference was grandly held. At this annual conference, the company’s employees carefully prepared a variety of programs for everyone. Hundreds of guests, including domestic and foreign customers, employees, and family members, were invited by employees of Brightway to gather...

    more

  • ZJ90/6750DB Solids Control System Is Put Into Operation

    Brightway developed three ZJ90/6750DB solid control systems that have been completed all assembling adjustments. The first one has been put into operation formaly. This system, is made up of six BWZS104G high frequency shale shaker, one BWZCQ270 vacuum degasser, one BWZJ104-3S16N mud cleaner, one mid-speed centrifuge, one...

    more

  • Happy Mid-autumn Festival and National Day

    On the occasion of the Mid-autumn Festival and National Day, Brightway company sends its most sincere blessings and care to the people of the country. Wishing everyone a happy Mid-autumn Festival and a happy National Day! Looking forward to working together with you to create a better future! Holiday Notice: From September...

    more

  • Second Generation Drilling Mud Cooler to Customers

    Recently, A second generation drilling mud cooler of Brightway has completed various production indicators and is ready to be delivered to customers. The second generation drilling mud cooler is the latest patented product of Brightway. Its structure consists of three large air cooling devices, water cooling devices, compression...

    more

  • Secretary of Municipal Party Committee Visited Brightway

    On July 4, a delegation led by Hu Zhongxiong, member of the Standing Committee of the CPC Guizhou Provincial Committee and Secretary of the CPC Guiyang Municipal Committee, visited Brightway for investigation and investment promotion. Chairman Liu Yuelang and General Manager Wang Yong of Brightway accompanied the inspection...

    more

Back to top