On Feb. 24th, Brightway one set of slurry treatment plant for pipe-jacking construction has been assembled completely and would be sent to Italy. The capacity of the slurry treatment plant is up to 250m³/h. The slurry treatment plant will be applied to pipe-jacking construction for sewage treatment.

new1702241

The slurry treatment plant is composed of double-deck shale shaker with stainless steel shaker screen, A set of combination desand hydrocyclone and desilter hydrocyclone, gravel pumps and other auxiliary equipment. the capacity is up to 250m³/h. In the design, The system is very compact so as to removed conveniently and save site area. It can meet the needs of pipe-jacking construction. Humanized escalators and highlighted lighting so as to operate safely at night. The customer is very satisfied with equipment production and humanized design.

Brightway 250m³/h Slurry Treatment Plant

In field of Micro-tunneling, pipe-jacking construction, Bored pile and river dredging, Brightway can manufacture different capacity slurry treatment plant, such as 120m³,150m³,180m³,220m³,250m³、300m³、500m³、1000m³ slurry treatment plant, for matching different diameter pipe jacking machine or shield tunneling machine. Welcome to visit Brightway factory to discuss cooperation!

Slurry Treatment Plant