• 300 Pieces of Shaker Screens Shipped to an Azerbaijan Customer

    On April 12, Brightway sent a batch of shale shaker screens to Azerbaijan. There are 300 shaker screens in this batch, including 200 composite shaker screens and 100 iron frame shaker screens. The specific size, mesh and specification of the screen mesh can match and meet the requirements of Azerbaijani customers’...

    more

  • Drilling Liquid Mud Plant Shipped to Customer

    We transported a shale gas drilling liquid mud plant in batches to our customers on March 26, 2022. We provided integrated solutions and services for this liquid mud plant project from planning, construction to production and operation. This liquid mud plant consists of about eight important equipment including...

    more

  • Multiple Sets of Solid Control Equipment Shipped to Thai Customers

    On March 20, 4 shale shakers and 2 vacuum degassers produced by Brightway have been loaded and ready to be sent to Thailand. Due to the reliable quality, stable performance and high performance of the company’s solid control equipment, the customer has maintained a good cooperative relationship with the company since...

    more

  • Work Principle of Centrifugal Pumps

    Centrifugal pump is the power source of desander, desilter, etc. in drilling fluid solids control equipment. In addition, it can also be used as a grouting pump for auxiliary grouting by a mud pump, a replenishment pump at the well, and transfer pump for drilling fluid between drilling fluid and mud tanks. The suction and...

    more

  • How to Choose Desander and Desilter?

    In the drilling fluid circulation system, the desander and desilter are both composed of a set of hydrocyclones and a small ultra-fine mesh shale shaker that processes the underflow of the cyclone and recovers the drilling fluid. Desander is used to remove 44-74μm solid phase particles, and desilter is used to remove 15-44μm...

    more

  • Dual Tandem Shale Shaker

    Dual tandem shale shaker is to install two shale shakers on a base at the same time. It is mainly for the convenience of regular solids control system installation. Generally, the drilling solids control system needs to be equipped with two or more single shale shakers. If a single shale shaker is selected for installation,...

    more

  • BWZS104 Dual Tandem Shale Shaker Shipped to Malaysia

    On March 15th, a set of BWZS104 Dual Tandem Shale Shaker of Brightway was being hoisted and shipped to Malaysian customers. This set of dual tandem shale shaker is a high-frequency shale shaker customized for the customer’s drilling rig solid control system. Because the customer’s drilling rig platform is too...

    more

  • BWSP-350 Slurry Separation Plant for Pipe Jacking Project Sent to Singapore

    On March 11, 2022, a BWSP-350 slurry separation plant  of Brightway was loaded and ready to be delivered to Singapore customers. This slurry separation plant is specially designed and produced for the pipe jacking construction project of an underground pipe network in Singapore. It is also the third contract between the...

    more

  • What Factors to Consider When Choosing a Decanter Centrifuge?

    For oil field and industrial services, especially in environmentally sensitive areas, decanter centrifuge, also known as decanting centrifuges, are particularly effective in drilling waste treatment, with high recovery rates and significantly reduced mud treatment and disposal costs. When choosing the type of centrifuge,...

    more

  • Desander, Desilter and Hydroyclones in Oil and Gas Drilling

    Desander and desilter are the second and third-stage desanding and desilting equipment in mud purification equipment. They process the smaller particle solid phase. Both the desander and desilter consist of a set of hydrocyclones and a small ultra-fine mesh screen that treats the underflow of the cyclone and recovers drilling...

    more

Back to top